◆ For California hvac contractors

Leer en español

HVAC contracts with the equipment, the permit and the HERS test spelled out

From a change-out to a full system, describe the equipment and the homeowner gets a contract with model numbers, duct work, Title 24 items and payments tied to startup.

License class: C-20 Warm-Air Heating, Ventilating and Air-Conditioning

Your first 3 contracts are free. No credit card.

What an HVAC scope has to say

  • Equipment by manufacturer, model and capacity (tons / BTU / SEER2), and what is being removed.
  • Ductwork: replaced, sealed or reused, and duct leakage testing if required.
  • Electrical, gas line, condensate, pad and disconnect work included.
  • Permit, Title 24 compliance forms and HERS verification, and who pays for them.
  • Thermostat, startup, commissioning and the manufacturer warranty registration.

§7159 points that catch HVAC contractors

  1. Equipment deposits are still down payments: $1,000 or 10%, whichever is less, until the equipment is delivered to the site.
  2. A payment on delivery of equipment is allowed only if the contract says the payment is for materials delivered.
  3. The contract must say whether you carry workers' compensation; CSLB cross-checks it against your license.
  4. Title 24 and HERS costs belong in the price or in a clear allowance, not as a surprise invoice.

Change orders HVAC contractors write

Panel upgrade needed for the new condenserDuct replacement after a failed leakage testAsbestos abatement on old duct wrapAdded zoning or a second thermostat

How it works

  1. 01

    Talk through the job or snap photos

  2. 02

    Review the scope and line-item estimate

  3. 03

    Homeowner signs on their phone

Other trades: Roofing · Solar · Remodel

General information for California contractors, not legal advice. Statutory requirements change; confirm specifics with counsel or CSLB.