◆ For California roofing contractors

Leer en español

Roofing contracts that close on the roof

Walk the roof, say what you see, and hand the homeowner a re-roof contract with the scope, the decking allowance, the progress payments and every California notice already in it.

License class: C-39 Roofing (or B General Building for multi-trade jobs)

Your first 3 contracts are free. No credit card.

Last reviewed: October 21, 2026

What is a California roofing contract under §7159?

A California roofing contract is a home improvement contract when the job is on a residence and the price is over $500, which brings it under Business & Professions Code §7159. The contractor must hold the right CSLB license, C-39 Roofing (or B General Building for multi-trade jobs), and the contract must be in writing, signed by both parties before work starts, and must state the price, the start and completion dates and a description of the work and materials. The down payment cannot exceed $1,000 or 10% of the price, whichever is less, and each progress payment must name the work completed before it is due. The contract must include the Mechanics Lien Warning, the CSLB notice, the insurance disclosures and the three-day right to cancel (five business days for buyers 65 and older). Any extra work needs a signed change order that states the scope, the price change and the effect on the schedule.

What a roofing scope has to say

  • Tear-off to the deck or overlay, and who disposes of the old roofing.
  • Decking: how many sheets are included and the per-sheet price beyond that, by written change order.
  • Underlayment, ice-and-water locations, drip edge, flashings, pipe jacks and ventilation, by product.
  • Shingle or tile product, color and manufacturer warranty passed through to the owner.
  • Permit, inspections and who schedules them.

§7159 points that catch roofers

  1. The down payment is capped at $1,000 or 10% of the price, whichever is less — even on a $40,000 tile roof.
  2. Each progress payment must name the work finished before it is due. "50% at start" is not allowed.
  3. Extra decking is extra work: it needs a signed change order with the price and schedule impact before you nail it down.
  4. Buyers 65 and older get five business days to cancel, not three. The contract has to say so.

Change orders roofers write every week

Rotten decking beyond the allowanceAdded skylight or ventHidden second layer on tear-offGutter replacement found on site

How it works

  1. 01

    Talk through the job or snap photos

  2. 02

    Review the scope and line-item estimate

  3. 03

    Homeowner signs on their phone

Roofing · §7159

Other trades: HVAC · Solar · Remodel

General information for California contractors, not legal advice. Statutory requirements change; confirm specifics with counsel or CSLB.

◆ COOKIESWe use essential cookies to run BIDGRIT (auth + billing) and optional analytics to improve the product. You can opt out of non-essential cookies at any time. Read our Privacy Policy. California residents: see our CCPA rights section.